
Alimak Hek supplied six Scando 650 construction hoists, with two hoists installed per pylon; one DOL serving sea level and one FC serving road level to the top of the pylon. The pylons are over 200 meter tall.
Alimak Hek also designed and supplied tie installation platforms on each hoist, proving a safe working environment for the installation of ties.
For more details on our construction hoists, please see our product page.