{"id":3163,"date":"2022-06-02T23:11:39","date_gmt":"2022-06-02T23:11:39","guid":{"rendered":"https:\/\/alimak.com\/au\/project\/mt-isa-mines-english\/"},"modified":"2022-06-02T23:11:34","modified_gmt":"2022-06-02T23:11:34","slug":"mt-isa-mines-english","status":"publish","type":"project","link":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/","title":{"rendered":"Mt Isa Mines"},"content":{"rendered":"\n<p><strong>Alimak works closely with Downer EDI to complete the dismantle of a 34-year old elevator, and the installation of a new Alimak elevator at Mt Isa Mines. With a lifting height of 252m, the Alimak industrial elevator provides critical maintenance access to the lead smelter chimney stack.\u00a0<\/strong><\/p>\n\n\n\n<p><strong>ACCESSING THE CHIMNEY STACK&nbsp;<\/strong><\/p>\n\n\n\n<p>Glencore Xstrata\u2019s Mt Isa Mines is one of the largest mining operations in Australia, with a silver-lead-zinc stream producing more than 30,000 tonnes of zinc concentrate, 170,000 tonnes of crude lead and 230 tonnes of silver lead in bullion each year.&nbsp;<\/p>\n\n\n\n<p>Built in 1978, the mine\u2019s lead smelter chimney stack stands at 270m tall, making it Australia\u2019s largest self-supported structure. An Electruck Easiriser elevator was originally installed within the chimney shaft, providing access to the six levels of the chimney stack for inspection and maintenance of the structure\u2019s aircraft beacons. After 34 years of use, the Electruck elevator was decommissioned in 2012 and replaced with a new Alimak SE 700 industrial elevator.&nbsp;<\/p>\n\n\n\n<p><strong>DISMANTLE, REMOVAL AND INSTALLATION&nbsp;<\/strong><\/p>\n\n\n\n<p>Completion of the project occurred in two stages: the first being the removal of the original Electruck elevator and the second involving the installation and commissioning of the new Alimak SE 700.&nbsp;<\/p>\n\n\n\n<p>At the customer\u2019s recommendation, Downer completed the dismantling and removal of the Electruck elevator. During dismantle, the elevator car was used as a work platform, allowing the Downer crew to drive the elevator car to the required height, dismantle 6m sections of the mast and then lower these through the elevator car to the ground below using a floor-mounted winch system.&nbsp;<\/p>\n\n\n\n<p>Once removal of the Electruck was complete, Alimak technicians began installation of the new Alimak SE 700 industrial elevator. Installation occurred in much the same way as the Electruck dismantle, with 9m lengths of the new mast winched up through the new Alimak SE elevator car. Alimak technicians used the roof of the new elevator car as a work platform from which to fix each of the new mast sections to the chimney\u2019s existing tie supports.&nbsp;<\/p>\n\n\n\n<p>Given the limited space within the chimney stack, the Alimak elevator was the ideal solution, as it could be configured to fit the existing space with only minor modifications. With a lifting height of 252m, accessing 5 landing levels, the new Alimak SE was a faster and more reliable alternative to the aging Electruck elevator. Travelling at a speed of 1.0m\/s, the Alimak elevator will make the 252m journey to the top of the chimney stack in under 4.5 minutes, while the original Electruck elevator required almost 7 minutes.\u00a0<\/p>\n\n\n\n<p><strong>ACCESS FOR CRITICAL MAINTENANCE AND INSPECTIONS&nbsp;<\/strong><\/p>\n\n\n\n<p>Due to the height of the chimney stack, the structure is fitted with essential air-craft warning lights that require weekly inspections and periodic changes. With the majority of the beacons located on the roof of the chimney stack, technicians are able to travel 252m to the top landing in the Alimak elevator. From there, an external ladder provides access to the roof lighting systems. Without the Alimak elevator, personnel would be required to climb an internal ladder system, which would be both time consuming and dangerous.&nbsp;<\/p>\n\n\n\n<p><strong>ALIMAK ON CHIMNEY STACKS&nbsp;<\/strong><\/p>\n\n\n\n<p>Alimak have completed numerous installations on chimney stacks around Australia, including Callide Power Station (220m), Kogan Creek Power Station (160m), Tarong Power Station (210m) and Loy Yang Power Station (260m). Alimak\u2019s rack and pinion industrial elevators are the ideal access solution for power plant structures, reducing the risk of falls from height, eliminating exertion from climbing and providing easy access for inspections, emission monitoring and maintenance.<\/p>\n\n\n\n<p><strong>ELEVATOR DETAILS<\/strong><\/p>\n\n\n\n<p>Location: Mt Isa Mines, Queensland, Australia<\/p>\n\n\n\n<p>Application: Chimney stack<\/p>\n\n\n\n<p>Elevator type: Rack and pinion<\/p>\n\n\n\n<p>Elevator model: Alimak SE 700<\/p>\n\n\n\n<p>Capacity: 700 kg<\/p>\n\n\n\n<p>Lifting height: 252 m<\/p>\n","protected":false},"featured_media":3466,"menu_order":0,"template":"","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"project-category":[],"region":[268],"industry":[11,276],"class_list":["post-3163","project","type-project","status-publish","has-post-thumbnail","hentry","region-australasia","industry-mining","industry-metal-and-steel"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mt Isa Mines - Alimak Canada<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mt Isa Mines - Alimak Canada\" \/>\n<meta property=\"og:description\" content=\"Alimak works closely with Downer EDI to complete the dismantle of a 34-year old elevator, and the installation of a new Alimak elevator at Mt Isa Mines. With a lifting height of 252m, the Alimak industrial elevator provides critical maintenance access to the lead smelter chimney stack.\u00a0 ACCESSING THE CHIMNEY STACK&nbsp; Glencore Xstrata\u2019s Mt Isa [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/\" \/>\n<meta property=\"og:site_name\" content=\"Alimak Canada\" \/>\n<meta property=\"og:image\" content=\"https:\/\/alimak.com\/ca\/wp-content\/uploads\/sites\/35\/2023\/10\/Mt-Isa-Mines-QLD-Australia3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1040\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/\",\"url\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/\",\"name\":\"Mt Isa Mines - Alimak Canada\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/alimak.com\\\/ca\\\/wp-content\\\/uploads\\\/sites\\\/35\\\/2023\\\/10\\\/Mt-Isa-Mines-QLD-Australia3.jpg\",\"datePublished\":\"2022-06-02T23:11:39+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/#primaryimage\",\"url\":\"https:\\\/\\\/alimak.com\\\/ca\\\/wp-content\\\/uploads\\\/sites\\\/35\\\/2023\\\/10\\\/Mt-Isa-Mines-QLD-Australia3.jpg\",\"contentUrl\":\"https:\\\/\\\/alimak.com\\\/ca\\\/wp-content\\\/uploads\\\/sites\\\/35\\\/2023\\\/10\\\/Mt-Isa-Mines-QLD-Australia3.jpg\",\"width\":1000,\"height\":1040},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/project\\\/mt-isa-mines-english\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/alimak.com\\\/ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/alimak.com\\\/ca\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mt Isa Mines\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/alimak.com\\\/ca\\\/#website\",\"url\":\"https:\\\/\\\/alimak.com\\\/ca\\\/\",\"name\":\"Alimak Canada\",\"description\":\"Global leaders in Vertical Access Solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/alimak.com\\\/ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mt Isa Mines - Alimak Canada","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/","og_locale":"en_US","og_type":"article","og_title":"Mt Isa Mines - Alimak Canada","og_description":"Alimak works closely with Downer EDI to complete the dismantle of a 34-year old elevator, and the installation of a new Alimak elevator at Mt Isa Mines. With a lifting height of 252m, the Alimak industrial elevator provides critical maintenance access to the lead smelter chimney stack.\u00a0 ACCESSING THE CHIMNEY STACK&nbsp; Glencore Xstrata\u2019s Mt Isa [&hellip;]","og_url":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/","og_site_name":"Alimak Canada","og_image":[{"width":1000,"height":1040,"url":"https:\/\/alimak.com\/ca\/wp-content\/uploads\/sites\/35\/2023\/10\/Mt-Isa-Mines-QLD-Australia3.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/","url":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/","name":"Mt Isa Mines - Alimak Canada","isPartOf":{"@id":"https:\/\/alimak.com\/ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/#primaryimage"},"image":{"@id":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/#primaryimage"},"thumbnailUrl":"https:\/\/alimak.com\/ca\/wp-content\/uploads\/sites\/35\/2023\/10\/Mt-Isa-Mines-QLD-Australia3.jpg","datePublished":"2022-06-02T23:11:39+00:00","breadcrumb":{"@id":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/#primaryimage","url":"https:\/\/alimak.com\/ca\/wp-content\/uploads\/sites\/35\/2023\/10\/Mt-Isa-Mines-QLD-Australia3.jpg","contentUrl":"https:\/\/alimak.com\/ca\/wp-content\/uploads\/sites\/35\/2023\/10\/Mt-Isa-Mines-QLD-Australia3.jpg","width":1000,"height":1040},{"@type":"BreadcrumbList","@id":"https:\/\/alimak.com\/ca\/project\/mt-isa-mines-english\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/alimak.com\/ca\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/alimak.com\/ca\/projects\/"},{"@type":"ListItem","position":3,"name":"Mt Isa Mines"}]},{"@type":"WebSite","@id":"https:\/\/alimak.com\/ca\/#website","url":"https:\/\/alimak.com\/ca\/","name":"Alimak Canada","description":"Global leaders in Vertical Access Solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/alimak.com\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"}]}},"_links":{"self":[{"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/project\/3163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/project\/3163\/revisions"}],"predecessor-version":[{"id":3164,"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/project\/3163\/revisions\/3164"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/media\/3466"}],"wp:attachment":[{"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/media?parent=3163"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/project-category?post=3163"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/region?post=3163"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/alimak.com\/ca\/wp-json\/wp\/v2\/industry?post=3163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}