{"id":649,"date":"2020-11-19T12:39:47","date_gmt":"2020-11-19T12:39:47","guid":{"rendered":"https:\/\/alimak.wpengine.com\/?post_type=project&#038;p=649"},"modified":"2021-01-14T02:35:34","modified_gmt":"2021-01-14T02:35:34","slug":"graincorp-grain-handling-facility-queensland-australia","status":"publish","type":"project","link":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/","title":{"rendered":"Graincorp Grain Handling Facility"},"content":{"rendered":"\n<p><strong>Alimak&nbsp;service technicians identify and replace 70 m of corroded mast and base frame to extend the life of a 26-year-old maintenance lift. Given the close proximity to power lines and the\u202fconfined space, a clever solution was required to complete the mast refurbishment.<\/strong>&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Grain processing facilities<\/strong>&nbsp;<\/h4>\n\n\n\n<p>Founded in 1916,&nbsp;Graincorp&nbsp;operate seven bulk grain export elevators in Eastern Australia, boasting a combined grain storage capacity of 20 million tonnes. Processing wheat, barley, canola, chickpeas and sorghum, delivered by road and&nbsp;Graincorp\u2019s&nbsp;extensive rail network, these facilities handle more than 5 million tonnes of grain annually.&nbsp;&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Maintenance access<\/strong>&nbsp;<\/h4>\n\n\n\n<p>Installed in 1986,&nbsp;Graincorp\u2019s&nbsp;Gladstone facility makes use of an Alimak rack and pinion lift to access the seven landings of their 70m grain stack. A critical piece of equipment on site, the Alimak lift allows maintenance staff to access higher levels of the stack for necessary servicing and maintenance. The lift also enables swift and safe access for emergency response if required.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Servicing identifies corrosion to the mast&nbsp;<\/strong>&nbsp;<\/h4>\n\n\n\n<p>Following an on-site service inspection, Alimak&nbsp;identified irreparable corrosive damage that had occurred to the base mast, base frame and a mast section located&nbsp;25m up the grain stack. Both sections were damaged beyond repair and required the entire 70m mast and base frame to be dismantled and replaced.&nbsp;<\/p>\n\n\n\n<p>Given the close proximity of power lines to the grain stack, Alimak&nbsp;was unable to angle a crane close enough to dismantle the lift mast. Without the use of a crane, mast sections could not be&nbsp;maneuvered&nbsp;over the power lines. A temporary disconnection of the lines would result in a&nbsp;shut down&nbsp;of&nbsp;Graincorp\u2019s&nbsp;entire Queensland rail system.&nbsp;&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>A clever solution<\/strong>&nbsp;<\/h4>\n\n\n\n<p>In order to replace the damaged mast, Alimak&nbsp;engineered and installed a unique winch that would allow the mast to be dismantled and reassembled manually. Fixed to the Alimak lift car, the Alimak&nbsp;winch was able to hook each mast section individually and angle the section onto the lift car roof area. Operators were then able to use the lift itself to deliver each section to the ground.&nbsp;&nbsp;<\/p>\n\n\n\n<p>In this way, each of the Gladstone grain stack\u2019s 49 mast sections were manually dismantled, with the same process used in reverse to assemble the replacement mast. Alimak&nbsp;worked closely with&nbsp;Graincorp&nbsp;throughout the duration of the project, providing&nbsp;engineering&nbsp;technical, electrical and rigging support.&nbsp;<\/p>\n\n\n\n<p>The Alimak rack and pinion lift\u2019s replacement mast has been in operation at the Gladstone facility since May 2012, providing&nbsp;Graincorp&nbsp;operators with access to the 7 levels of the grain stack. Alimak\u2019s&nbsp;manual winch approach may be used in future projects where site restrictions prevent crane access.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">DETAILS<\/h4>\n\n\n\n<p>Location: Graincorp Grain Handling Facility, QLD, Australia<\/p>\n\n\n\n<p>Installation year: 1986<\/p>\n\n\n\n<p>Application: Grain handling facility, lift access<\/p>\n\n\n\n<p>Lift type: Alimak Scando 10\/19<\/p>\n\n\n\n<p>No. of landings: 7<\/p>\n\n\n\n<p>Capacity: 1000 kg<\/p>\n\n\n\n<p>Car size: 1.9 m x 1.2 m<\/p>\n\n\n\n<p>Speed: 0.65 m\/sec<\/p>\n\n\n\n<p>Lifting height: 70 m<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">GALLERY<\/h4>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"262\" height=\"264\" src=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules.jpg\" alt=\"\" data-id=\"651\" data-link=\"https:\/\/alimak.com\/my\/?attachment_id=651\" class=\"wp-image-651\" srcset=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules.jpg 262w, https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-150x150.jpg 150w\" sizes=\"auto, (max-width: 262px) 100vw, 262px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"262\" height=\"264\" src=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-2.jpg\" alt=\"\" data-id=\"652\" data-full-url=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-2.jpg\" data-link=\"https:\/\/alimak.com\/my\/?attachment_id=652\" class=\"wp-image-652\" srcset=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-2.jpg 262w, https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-2-150x150.jpg 150w\" sizes=\"auto, (max-width: 262px) 100vw, 262px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"262\" height=\"264\" src=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-3.jpg\" alt=\"\" data-id=\"653\" data-full-url=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-3.jpg\" data-link=\"https:\/\/alimak.com\/my\/?attachment_id=653\" class=\"wp-image-653\" srcset=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-3.jpg 262w, https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Gallery-modules-3-150x150.jpg 150w\" sizes=\"auto, (max-width: 262px) 100vw, 262px\" \/><\/figure><\/li><\/ul><\/figure>\n","protected":false},"featured_media":654,"menu_order":28,"template":"","meta":{"_trash_the_other_posts":false,"editor_notices":[],"footnotes":""},"project-category":[],"region":[268],"industry":[15],"class_list":["post-649","project","type-project","status-publish","has-post-thumbnail","hentry","region-australasia","industry-grain"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Graincorp Grain Handling Facility - Alimak Malaysia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Graincorp Grain Handling Facility - Alimak Malaysia\" \/>\n<meta property=\"og:description\" content=\"Alimak&nbsp;service technicians identify and replace 70 m of corroded mast and base frame to extend the life of a 26-year-old maintenance lift. Given the close proximity to power lines and the\u202fconfined space, a clever solution was required to complete the mast refurbishment.&nbsp; Grain processing facilities&nbsp; Founded in 1916,&nbsp;Graincorp&nbsp;operate seven bulk grain export elevators in Eastern [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/\" \/>\n<meta property=\"og:site_name\" content=\"Alimak Malaysia\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-14T02:35:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"408\" \/>\n\t<meta property=\"og:image:height\" content=\"408\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/\",\"url\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/\",\"name\":\"Graincorp Grain Handling Facility - Alimak Malaysia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/alimak.com\\\/my\\\/wp-content\\\/uploads\\\/sites\\\/23\\\/2020\\\/11\\\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg\",\"datePublished\":\"2020-11-19T12:39:47+00:00\",\"dateModified\":\"2021-01-14T02:35:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/alimak.com\\\/my\\\/wp-content\\\/uploads\\\/sites\\\/23\\\/2020\\\/11\\\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg\",\"contentUrl\":\"https:\\\/\\\/alimak.com\\\/my\\\/wp-content\\\/uploads\\\/sites\\\/23\\\/2020\\\/11\\\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg\",\"width\":408,\"height\":408},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/project\\\/graincorp-grain-handling-facility-queensland-australia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/alimak.com\\\/my\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/alimak.com\\\/my\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Graincorp Grain Handling Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/alimak.com\\\/my\\\/#website\",\"url\":\"https:\\\/\\\/alimak.com\\\/my\\\/\",\"name\":\"Alimak Malaysia\",\"description\":\"Global leaders in Vertical Access Solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/alimak.com\\\/my\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Graincorp Grain Handling Facility - Alimak Malaysia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/","og_locale":"en_US","og_type":"article","og_title":"Graincorp Grain Handling Facility - Alimak Malaysia","og_description":"Alimak&nbsp;service technicians identify and replace 70 m of corroded mast and base frame to extend the life of a 26-year-old maintenance lift. Given the close proximity to power lines and the\u202fconfined space, a clever solution was required to complete the mast refurbishment.&nbsp; Grain processing facilities&nbsp; Founded in 1916,&nbsp;Graincorp&nbsp;operate seven bulk grain export elevators in Eastern [&hellip;]","og_url":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/","og_site_name":"Alimak Malaysia","article_modified_time":"2021-01-14T02:35:34+00:00","og_image":[{"width":408,"height":408,"url":"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/","url":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/","name":"Graincorp Grain Handling Facility - Alimak Malaysia","isPartOf":{"@id":"https:\/\/alimak.com\/my\/#website"},"primaryImageOfPage":{"@id":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/#primaryimage"},"image":{"@id":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/#primaryimage"},"thumbnailUrl":"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg","datePublished":"2020-11-19T12:39:47+00:00","dateModified":"2021-01-14T02:35:34+00:00","breadcrumb":{"@id":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/#primaryimage","url":"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg","contentUrl":"https:\/\/alimak.com\/my\/wp-content\/uploads\/sites\/23\/2020\/11\/Graincorp-Grain-Handling-Facility-Australia-Project-tiles.jpg","width":408,"height":408},{"@type":"BreadcrumbList","@id":"https:\/\/alimak.com\/my\/project\/graincorp-grain-handling-facility-queensland-australia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/alimak.com\/my\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/alimak.com\/my\/projects\/"},{"@type":"ListItem","position":3,"name":"Graincorp Grain Handling Facility"}]},{"@type":"WebSite","@id":"https:\/\/alimak.com\/my\/#website","url":"https:\/\/alimak.com\/my\/","name":"Alimak Malaysia","description":"Global leaders in Vertical Access Solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/alimak.com\/my\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/project\/649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/project\/649\/revisions"}],"predecessor-version":[{"id":2710,"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/project\/649\/revisions\/2710"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/media\/654"}],"wp:attachment":[{"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/media?parent=649"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/project-category?post=649"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/region?post=649"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/alimak.com\/my\/wp-json\/wp\/v2\/industry?post=649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}