{"id":3733,"date":"2024-10-09T13:23:03","date_gmt":"2024-10-09T13:23:03","guid":{"rendered":"https:\/\/alimak.com\/uk\/?post_type=project&p=3733"},"modified":"2024-10-09T13:25:17","modified_gmt":"2024-10-09T13:25:17","slug":"wood-wharf-b2-2","status":"publish","type":"project","link":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/","title":{"rendered":"WOOD WHARF B2"},"content":{"rendered":"\n

Ten Alimak TM single and twin mast climbing work platforms, and one construction hoist were installed during construction of the B2 Wood Wharf project; Canary Wharf\u2019s first modular building.<\/strong><\/p>\n\n\n\n

MODULAR PROJECT
<\/strong>The Wood Wharf B2 project is Canary Wharf\u2019s first modular building, comprising of 279 apartments, along with several retail units and restaurants. As a modular project, each apartment unit was constructed off-site, including fitted bathrooms, kitchens, and furniture. The units were then transported to site and installed.<\/p>\n\n\n\n

MAST CLIMBING WORK PLATFORMS
<\/strong>A total of ten Alimak MC 650 and MC 450 mast climbing work platforms were installed on the project to assist in the modular apartment installations, with the customer opting for both single and twin masted configurations, with a combination of A and B drives. The platform lengths ranged from 4.2 m to 28.3 m long, with payload capacities from 2,000 kg to 6,960 kg.<\/p>\n\n\n\n

Choosing both A and B drives enables the mast climbers to be used independently from each other, which greatly increases efficiency on site. As each apartment unit was lifted onto the building via crane, the construction team were able to stand on the platform and guide the units into place. Additionally, the mast climbers provided access to install glazing panels on the building fa\u00e7ade, decreasing the total build time. Glazing panels are usually the final part of the building\u2019s construction, however, using Alimak mast climbers allowed panels to be installed on lower floors, even while the upper floors were still being constructed.<\/p>\n\n\n\n

MONORAILS
<\/strong>Monorails fitted with a remote-controlled electric winch, were installed at the top of the mast of each mast climber. The monorails work together with the mast climbers, enabling heavy fa\u00e7ade elements to be moved into position by workers standing on the platform.<\/p>\n\n\n\n

The length of each monorail matched the mast climber\u2019s platform length, enabling full utilisation of the working space.<\/p>\n\n\n\n

The two longest mast climbers had their monorails fitted with two winches. This allowed two separate installation teams to install cladding panels at the same time, thereby boosting productivity.<\/p>\n\n\n\n

CONSTRUCTION HOIST
<\/strong>An Alimak Scando 650 FC construction hoist, with a payload capacity of 2,500 kg, was also installed on the project. This provided vertical access for both personnel and materials, enabling the project to run efficiently and enhanching safety.<\/p>\n\n\n\n

Instead of the stand 3.2 m hoist length, Alimak engineers added an extension to just one side of the hoist, to allow the maximum car size of 4.45 m to fit within the space constraints.<\/p>\n\n\n\n

PLATFORM DETAILS
<\/strong>Location: Canary Wharf, London, UK
Application: High-rise construction
Product category: Mast climbing work platforms
Models: Alimak MC 650 and MC 450
No. of platforms 10 (4x single masted, 6x twin masted)
Platform lengths: 4.2\u201328.3 m
Capacity: Up to 6,960 kg
Speed: 11 m\/min
Lifting height: 70 m<\/p>\n\n\n\n

HOIST DETAILS
<\/strong>Location: Canary Wharf, London, UK
Application: High-rise construction
Product category: Construction hoists
Models: Alimak Scando 650 FC
No. of hoist cars: 1
Car size: 1.5 x 4.45 m (W x L)
Capacity: Up to 2,500 kg
Speed: 54 m\/min
Lifting height: 71 m<\/p>\n","protected":false},"featured_media":3735,"menu_order":0,"template":"","meta":{"footnotes":""},"project-category":[],"region":[266],"industry":[14],"class_list":["post-3733","project","type-project","status-publish","has-post-thumbnail","hentry","region-europe","industry-construction"],"yoast_head":"\nWOOD WHARF B2 - Alimak United Kingdom<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WOOD WHARF B2 - Alimak United Kingdom\" \/>\n<meta property=\"og:description\" content=\"Ten Alimak TM single and twin mast climbing work platforms, and one construction hoist were installed during construction of the B2 Wood Wharf project; Canary Wharf\u2019s first modular building. MODULAR PROJECTThe Wood Wharf B2 project is Canary Wharf\u2019s first modular building, comprising of 279 apartments, along with several retail units and restaurants. As a modular […]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Alimak United Kingdom\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-09T13:25:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/\",\"url\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/\",\"name\":\"WOOD WHARF B2 - Alimak United Kingdom\",\"isPartOf\":{\"@id\":\"https:\/\/alimak.com\/uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg\",\"datePublished\":\"2024-10-09T13:23:03+00:00\",\"dateModified\":\"2024-10-09T13:25:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#primaryimage\",\"url\":\"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg\",\"contentUrl\":\"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg\",\"width\":2560,\"height\":2560},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/alimak.com\/uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/alimak.com\/uk\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"WOOD WHARF B2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/alimak.com\/uk\/#website\",\"url\":\"https:\/\/alimak.com\/uk\/\",\"name\":\"Alimak United Kingdom\",\"description\":\"Global leaders in Vertical Access Solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/alimak.com\/uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"WOOD WHARF B2 - Alimak United Kingdom","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/","og_locale":"en_GB","og_type":"article","og_title":"WOOD WHARF B2 - Alimak United Kingdom","og_description":"Ten Alimak TM single and twin mast climbing work platforms, and one construction hoist were installed during construction of the B2 Wood Wharf project; Canary Wharf\u2019s first modular building. MODULAR PROJECTThe Wood Wharf B2 project is Canary Wharf\u2019s first modular building, comprising of 279 apartments, along with several retail units and restaurants. As a modular […]","og_url":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/","og_site_name":"Alimak United Kingdom","article_modified_time":"2024-10-09T13:25:17+00:00","og_image":[{"width":2560,"height":2560,"url":"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/","url":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/","name":"WOOD WHARF B2 - Alimak United Kingdom","isPartOf":{"@id":"https:\/\/alimak.com\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#primaryimage"},"image":{"@id":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#primaryimage"},"thumbnailUrl":"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg","datePublished":"2024-10-09T13:23:03+00:00","dateModified":"2024-10-09T13:25:17+00:00","breadcrumb":{"@id":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#primaryimage","url":"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg","contentUrl":"https:\/\/alimak.com\/uk\/wp-content\/uploads\/sites\/30\/2024\/10\/wood-wharf-b2-408x408px-scaled.jpg","width":2560,"height":2560},{"@type":"BreadcrumbList","@id":"https:\/\/alimak.com\/uk\/project\/wood-wharf-b2-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/alimak.com\/uk\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/alimak.com\/uk\/projects\/"},{"@type":"ListItem","position":3,"name":"WOOD WHARF B2"}]},{"@type":"WebSite","@id":"https:\/\/alimak.com\/uk\/#website","url":"https:\/\/alimak.com\/uk\/","name":"Alimak United Kingdom","description":"Global leaders in Vertical Access Solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/alimak.com\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"}]}},"_links":{"self":[{"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/project\/3733"}],"collection":[{"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/project\/3733\/revisions"}],"predecessor-version":[{"id":3736,"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/project\/3733\/revisions\/3736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/media\/3735"}],"wp:attachment":[{"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/media?parent=3733"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/project-category?post=3733"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/region?post=3733"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/alimak.com\/uk\/wp-json\/wp\/v2\/industry?post=3733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}