Alimak Mast Climbers and Construction Hoist at work on Canary Wharf’s first modular building

Ten Alimak TM single and twin mast climbing work platforms, and one construction hoist were installed during construction of the B2 Wood Wharf project; Canary Wharf’s first modular building.

MODULAR PROJECT
The Wood Wharf B2 project is Canary Wharf’s first modular building, comprising of 279 apartments, along with several retail units and restaurants. As a modular project, each apartment unit was constructed off-site, including fitted bathrooms, kitchens, and furniture. The units were then transported to site and installed.

MAST CLIMBING WORK PLATFORMS
A total of ten Alimak MC 650 and MC 450 mast climbing work platforms were installed on the project to assist in the modular apartment installations, with the customer opting for both single and twin masted configurations, with a combination of A and B drives. The platform lengths ranged from 4.2 m to 28.3 m long, with payload capacities from 2,000 kg to 6,960 kg.

Choosing both A and B drives enables the mast climbers to be used independently from each other, which greatly increases efficiency on site. As each apartment unit was lifted onto the building via crane, the construction team were able to stand on the platform and guide the units into place. Additionally, the mast climbers provided access to install glazing panels on the building façade, decreasing the total build time. Glazing panels are usually the final part of the building’s construction, however, using Alimak mast climbers allowed panels to be installed on lower floors, even while the upper floors were still being constructed.

MONORAILS
Monorails fitted with a remote-controlled electric winch, were installed at the top of the mast of each mast climber. The monorails work together with the mast climbers, enabling heavy façade elements to be moved into position by workers standing on the platform.

The length of each monorail matched the mast climber’s platform length, enabling full utilisation of the working space.

The two longest mast climbers had their monorails fitted with two winches. This allowed two separate installation teams to install cladding panels at the same time, thereby boosting productivity.

CONSTRUCTION HOIST
An Alimak Scando 650 FC construction hoist, with a payload capacity of 2,500 kg, was also installed on the project. This provided vertical access for both personnel and materials, enabling the project to run efficiently and enhanching safety.

Instead of the stand 3.2 m hoist length, Alimak engineers added an extension to just one side of the hoist, to allow the maximum car size of 4.45 m to fit within the space constraints.

PLATFORM DETAILS
Location: Canary Wharf, London, UK
Application: High-rise construction
Product category: Mast climbing work platforms
Models: Alimak MC 650 and MC 450
No. of platforms 10 (4x single masted, 6x twin masted)
Platform lengths: 4.2–28.3 m
Capacity: Up to 6,960 kg
Speed: 11 m/min
Lifting height: 70 m

HOIST DETAILS
Location: Canary Wharf, London, UK
Application: High-rise construction
Product category: Construction hoists
Models: Alimak Scando 650 FC
No. of hoist cars: 1
Car size: 1.5 x 4.45 m (W x L)
Capacity: Up to 2,500 kg
Speed: 54 m/min
Lifting height: 71 m

Get in touch for more information or a quote

Need help selecting the right product for an upcoming project? Get in touch with our product experts for information on the range of vertical access solutions available and a quotation to meet the needs of your project.

Request a Quote

Find a local representative

Present across six continents, Alimak utilises a global network to deliver vertical access solutions for a wide range of applications on construction and industrial sites around the world. Get in touch to find a local representative from Alimak’s global network.

Search Directory